![]() ![]() We know that the Release Date for when people got 1.07 was on the LOD launch day: June 27, 2001. So this makes us wonder, how did this development timeline actually happened between 1.07 (CD Version) vs 1.08 ( Day 1 Version)? Was the D2 LOD Beta happening in the meantime? Are there any other patch notes available out there between this period of time? Let's dig deeper. Thus, Blizzard probably sent a "relatively stable enough" build of the game to the production companies for mass production, and in the meantime, Blizzard could spend the next few months finishing up as much as they could by launch date (Hence the Day 1 Update on : 1.08). Normally a company would need to provide some sort of "Gold Image" to the manufacturers so that they could mass produce the physical disks that would need to eventually be shipped out worldwide, and land in store shelves, by launch day. I'm sure that the reason for this is simply due to the production and manufacturing process. We also know that it was only available to be played on Single Player since as soon as you connected to, you would be upgraded to 1.08. ![]() So we all know that Patch 1.07 was the first expansion version that came on the CD and that there were many incomplete parts of the game still (i.e TC, MF, Runewords, Etc), that there were many bugs in the game, and that the game overall felt a bit beta-ish.
0 Comments
Leave a Reply. |
AuthorWrite something about yourself. No need to be fancy, just an overview. ArchivesCategories |